
Project Scope
Old fibreglass pool removal and full backfill with engineered fill. Site re-graded for landscaping.
The Challenge
Aging fibreglass pool, perished plumbing, and a homeowner wanting the area returned to lawn quickly. All services had to be capped and certified.
How We Approached It
- 1Pool drained and pumped dry day 1
- 2Plumbing capped and certified by licensed plumber
- 3Fibreglass shell broken up and removed in sections
- 4Pool cavity backfilled with imported crusher dust in compacted lifts
- 5Top 200mm topsoil cap for turf-ready surface
- 6Final grade to slope away from the house
Equipment Used
- 3T excavator
- Plate compactor
- 6T tipper for backfill delivery and shell removal
Materials Handled
Old fibreglass shell + 1.5m³ of perished pump and pipework
Outcome
Pool gone, site flat and compacted. Ready for turf within 24 hours of finish.
Key Takeaways
- Engineered backfill is the right call when future structures might go on top
- Capping plumbing properly with a certified plumber prevents future drainage issues
- Crusher dust backfill compacts tight and is the smart-money choice for pool fill-ins
Have a job like this?
Free site visit, fixed-price quote, owner-operated.


