Currumbin Valley Steep Block Retaining Cut

Project Scope
Steep hinterland block — 1.8m cut with retaining wall bench prep. Boulder breaking required for the lower bench.
The Challenge
1.8m cut into a steep slope required engineer-designed batter and retaining wall combination. Lower bench area had buried boulders — couldn't be quoted from the street.
How We Approached It
- 1Site visit with the engineer to walk the design
- 2Topsoil stripped and stockpiled for the terrace gardens
- 3Bulk cut in three benches following the engineer's design
- 4Boulder pocket hit on lower bench — hydraulic breaker fitted to handle
- 5Bench leveled and trimmed to retaining wall trade's requirement
- 6Cut spoil pushed and shaped into the lower terrace
Equipment Used
- 5T excavator with rock breaker
- 3T excavator for bench trim
- Plate compactor
Materials Handled
Zero cart-away — all spoil reused on lower terrace and garden shaping
Outcome
Bench delivered ready for retaining wall trade. Spoil reused on the lower garden terrace.
Key Takeaways
- On steep blocks, planning the spoil destination upfront saves real money
- Coordinating with the engineer at site visit catches design issues early
- Hidden boulders are a Currumbin Valley reality — quote with rock allowance
Have a job like this?
Free site visit, fixed-price quote, owner-operated.